Plumbed in With a few leaks

Well finally got out in the greenhouse today and worked on the system. Have been super busy lately, so haven’t been working out there.

But today I got the plumbing to the grow beds and the return to the holding tanks in.

Got all the bell syphons in the line from the pickle barrels and the return lines in.

That is where the went well part ended…lol

I was able to use the parts from the old system for the bell syphons

Here is how I tied the grow beds together to make sure they fill at the same rate.

The Duck weed tank full and draining

showing the intake for the Duckweed drain. So it will pull water from under the Duckweed and not drain it in to the fish tank.

This is the line to the grow bed almost full

Just as the water started to flow to the grow beds.

Water to the grow beds.

Here is where the good news stopped.  The water only made it to the first bed.  After I re-checked. the pipe ran up hill from here. So I will have to do a little re-plumbing. But other than that and a few leaks( every thing is dry fitted) it works well.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s